The 4-Lane Rajapara–Payra Port Connecting Road is a vital infrastructure project in Kalapara, Patuakhali, linking the Payra Sea Port to the national highway network. It supports heavy freight mobility for Bangladesh’s third economic corridor.
Project Overview
Location: Kalapara Upazila, Patuakhali District. [1]
Route: Rajapara (Patuakhali-Kuakata Highway) to Payra Port / Dhankhali. [1, 2]
Project Scope: Construction of a 4-lane RCC (Reinforced Cement Concrete) highway with service roads on both sides.
Implementation Progress
Early variation and package proposals—such as the 6.35 km package WD-22—have faced administrative reviews like CCGP rejection.
Supervision and management are handled by SARM Associates Limited and Sheltech Consultants (Pvt.) Ltd..
Construction execution involves firms like M M Builders & Engineers Ltd. and NKFTCL. [1, 2, 3, 4, 5]
Key Developments
- Connectivity: The access road connects the newly developed multipurpose terminal (featuring a 650-meter jetty) to ensure seamless cargo operations.
- Broader Network: Complements the nearby 5.2 km Sheikh Hasina Road approach and the Patuakhali-Kuakata highway corridor.
- Timeline & Deadlines: Port terminal facilities and associated access road projects are targeting full operational readiness. [1, 2, 3, 4, 5]
